Our material are from Japan, Taiwan and Korea to ensure high quality products are manufactured. We handle the stock with strict FIFO Systems. Hence, the possibility of human error is eliminated.
02
ProcessHeading
The heading process is the process in making the “Head” of the bolt or screw. We equip our lines with most recent technology in order to form a high precision products.
03
ProcessRolling
The rolling process is the process of forming the “Thread” of bolt or screw. There are also automatic assembly rolling process to attach the washer (Ring) directly to the bolt or screw.
04
ProcessSecondary Process
The secondary lines are manual lines to produce special products that need to be lathed, torreted, drilled, etc.
05
ProcessHeat Treatment
We equip our factory with heat treatment lines. They are a continous process. Heat treatment lines are also installed with computerized systems.
06
ProcessPlating
Although we subcontracted electro plating processes, we directly and strictly supervised our subcontractors. We also conduct the system and process audit periodically in timely manner.
07
ProcessFinal Quality
We check 100% of our products to ensure high quality products are delivered to our customers. We also equip our lines with fully automatic sorter machines.
08
ProcessPacking
Packaging systems are provided to make sure the products are “Safe” to be delivered. We will invest in near future, automatic packaging systems.